When you send a transoceanic message, your data most likely travels not via satellite but through fiber-optic cables laid on the seabed. The industry-standard claim is that submarine cables carry approximately 99% of intercontinental data traffic. Yet the organization responsible for maintaining this figure admitted in 2023 that it cannot calculate it precisely. This article juxtaposes data from industry analysts, the United Nations Environment Programme (UNEP), the U.S. Congressional Research Service (CRS), submarine cable associations, and publicly available Baltic Sea records to answer three questions: Who owns these cables? Who protects them? And who repairs them when they break?

## A Number That Cannot Be Precisely Calculated

The 99% figure is most commonly traced to the industry data provider TeleGeography. Researcher Alan Mauldin clarified in a myth-busting article published on May 4, 2023 ([link](https://resources.telegeography.com/2023-mythbusting-part-3)) that while the number has been repeatedly cited by media outlets, its original source is rarely attributed. Mauldin confirmed that ">99%" holds broadly, but emphasized that no reliable data exists on intercontinental satellite traffic volume—making precise calculation impossible. A frequently cited supporting statistic—the Federal Communications Commission’s (FCC) 0.37% satellite share—covers only U.S. international capacity, relies on 2013 data, was published in 2015, and has since been discontinued; subtracting it does not yield a robust 99.63%. Similarly, the UNEP World Conservation Monitoring Centre (UNEP-WCMC)’s 2025 report “[Submarine Cables and Marine Biodiversity](https://iscpc.org/documents/?id=4266)” cites “>99%”, but explicitly attributes it to secondary industry literature—not independent measurement. The report was jointly produced by UNEP-WCMC and the International Cable Protection Committee (ICPC); external reviewers included former ICPC Chair Malcolm Eccles and veteran cable industry professional Ronald Rapp. Citations must acknowledge their provenance.

Though the number remains unverifiable, the scale is real. TeleGeography’s [FAQ page](https://www2.telegeography.com/submarine-cable-faqs-frequently-asked-questions) (accessed November 20, 2026) lists over 600 operational and planned submarine cable systems worldwide. UNEP-WCMC’s report estimates the global total length at approximately 1.7 million kilometers; deep-sea cable diameter measures only 17–21 millimeters, and the total area occupied by all cables within 10 meters of the seabed accounts for less than 0.01% of the seafloor. A glass filament no thicker than a garden hose carries the entire intercontinental internet.

## Born as a Target of War

The political nature of submarine cables is inscribed in their origin. In 1854, American businessman Cyrus West Field launched the transatlantic telegraph project, ordering 2,500 nautical miles (4,600 km) of cable from Gutta Percha Company before even incorporating his company. The Atlantic Telegraph Company was formally established in 1856, with John Watkins Brett as president, Field as vice president, physician Wildman Whitehouse as chief electrician, and William Thomson (later Lord Kelvin) joining the board. According to the [Wikipedia entry on the transatlantic telegraph cable](https://en.wikipedia.org/wiki/Transatlantic_telegraph_cable), on August 5, 1858, HMS Agamemnon arrived at Valentia Island, Ireland, to complete the connection; on August 16, the first official telegram—a 98-word congratulatory message from Queen Victoria to U.S. President James Buchanan—took 16 hours to transmit. New York celebrated with 100 cannon salutes the next day; Broadway held a parade on September 1. Insulation degraded daily, and transmission ceased entirely by early September after just 732 messages. Whitehouse, who advocated high-voltage transmission, was dismissed; Thomson’s mirror galvanometer proved correct. In 1865, the SS Great Eastern broke cable mid-lay; on July 27, 1866, a new cable entered service at Heart’s Content, Newfoundland—and later that year, a grappling hook retrieved the 1865 broken cable, enabling its repair and reconnection.

The imperial era transformed cable networks into strategic assets. As noted in the [Wikipedia entry on submarine communications cables](https://en.wikipedia.org/wiki/Submarine_communications_cable), British companies owned and operated two-thirds of the world’s cables in 1892; by 1896, 24 of the globe’s 30 cable-laying ships were British-owned. Britain insisted on the “All Red Route”—routing all traffic exclusively through British territory—because wartime cables crossing foreign soil could be severed. Upon declaring war on Germany in WWI, Britain’s first action was dispatching the cable ship HMS Alert to cut five German cables linking Germany to France, Spain, and the Azores (often misattributed to the Telconia). Germany was forced to rely on radio, which Room 40 successfully intercepted. The Cold War extended this logic underwater: In October 1971, the specially modified submarine USS Halibut tapped into a Soviet Pacific Fleet military cable connecting Petropavlovsk to mainland Russia in the Sea of Okhotsk. Divers retrieved magnetic tapes monthly; initial analysis revealed most Soviet military communications were unencrypted. As documented in the [Wikipedia entry on Operation Ivy Bells](https://en.wikipedia.org/wiki/Operation_Ivy_Bells), NSA analyst Ronald Pelton, burdened by $65,000 in debt, sold intelligence to the KGB in 1980; the operation ended in 1981. Rules governing protection remain largely undefined.

## From Consortia to Tech Giants

Ownership in the telephone era followed a consortium model. TAT-1—the first transatlantic telephone cable, inaugurated on September 25, 1956, between Oban, Scotland, and Clarenville, Newfoundland—was jointly built and owned by multiple national telecom operators. The U.S. Congressional Research Service (CRS) reported on September 13, 2022 ([“Undersea Cables: Background and Issues for Congress,” R47237](https://www.everycrsreport.com/reports/R47237.html)) that, as of April 2022, there were 486 commercial submarine cable systems and 1,306 landing stations globally (per TeleGeography data), noting that demand from cloud providers—including Amazon, Microsoft, and Google—has driven new cable construction. A footnote in the CRS report cites a 95% intercontinental share, coexisting with the 99% figure; this article treats them separately.

Tech giants have turned cables into proprietary assets. Meta announced its 2Africa project on May 13, 2020, in an [engineering blog post](https://engineering.fb.com/2020/05/13/connectivity/2africa/): a 37,000-kilometer system—roughly Earth’s circumference—with capacity about three times the sum of all existing African cables at the time, motivated by the fact that 3.5 billion people remained unconnected in 2020. Vendor self-reports are cited per public announcements; a 2021 capacity expansion announcement was not captured and is excluded. CRS also notes the MAREA cable features eight fiber pairs and a design capacity of 160 Tbps, upgraded to 200 Tbps in 2018 (TeleGeography’s FAQ cites a potential capacity of 224 Tbps under different assumptions—these figures are not conflated here). In the consortium era, mutual protection prevailed: if your cable failed, my traffic suffered. Private cables prioritize internal cloud operations first. The Baltic Sea has become a testbed.

## The Real Single Point of Failure Is the Repair Vessel

Cables themselves incorporate redundancy. TeleGeography’s FAQ, citing ICPC data, states roughly 200 faults occur annually, with fishing gear and ship anchors accounting for two-thirds; shark bites caused zero failures between 2007 and 2014. The industry refers to “quantity-based safety”: sufficient route diversity means most breaks go unnoticed by users.

What lacks redundancy is repair capacity. The repair process has changed little in a century: locate, mark with buoys, retrieve with grapnels, splice aboard ship. Halifax maintained half a dozen repair vessels for much of the 20th century; today, CRS reports that the U.S. Navy, via its Military Sealift Command, operates only one dedicated cable ship—the USNS Zeus (which maintains 40,000 miles of military cable). The commercial vessel C.S. Dependable re-flagged to the U.S. in December 2021. A dedicated CRS section discusses investment in repair vessels: industry observers note that both laying and repair fleets are booked years in advance. ICPC’s [Global Comparison of Repair Commencement Times report](https://iscpc.org/publications/icpc-global-comparison-of-repair-commencement-times/) (last updated August 28, 2026) requires member login for full data. Its stated purpose is to support governments and regulators in improving permitting efficiency and reducing unnecessary delays. Is the bottleneck the vessels—or the permits? Industry associations bet on the latter. On October 8, 2023, pressure in the Balticconnector natural gas pipeline dropped abruptly from 34.5 bar to 12 bar; nearby data cables were simultaneously damaged. As recorded in the [Wikipedia entry on Balticconnector](https://en.wikipedia.org/wiki/Balticconnector), repairs concluded only on April 22, 2024—approximately six months later.

## The Attribution Vacuum in the Baltic Sea

Three incidents in the Baltic Sea between 2023 and 2025 brought the questions “Who repaired it?” and “Who did it?” into sharp focus. Act I: Following damage to the Balticconnector and adjacent telecom cables, the Chinese-owned vessel NewNew Polar Bear (formerly Baltic Fulmar), operated by NewNew Shipping, was identified. Photos taken on October 22, 2023, in Arkhangelsk, Russia, showed the ship missing its port anchor; the damaged anchor was recovered from the seabed on October 24. China acknowledged the vessel’s passage on August 12, 2024, characterizing the incident as an “accident under severe storm conditions.” However, the Finnish Meteorological Institute and others confirmed no storms occurred in the Gulf of Finland at the time. Eoin Micheal McNamara, global security expert at the Finnish Institute of International Affairs, observed that plausible deniability is a core principle of hybrid interference—and flag-of-convenience vessels exist precisely to enable it. Act II: Between November 17–18, 2024, the 218-kilometer BCS East-West Interlink (Lithuania–Sweden) and the 1,173-kilometer C-Lion1 cable (operated by Cinia, designed for 120 Tbit/s, Finland–Germany) failed in close proximity and rapid succession. As summarized in the [Wikipedia entry on the 2024 Baltic Sea submarine cable disruptions](https://en.wikipedia.org/wiki/2024_Baltic_Sea_submarine_cable_disruptions), the Chinese cargo ship Yi Peng 3 was present near both sites; the Danish Navy tracked it in the Great Belt Strait. German Defense Minister Boris Pistorius stated—via The Guardian’s paraphrase—“We assume sabotage.” Sweden requested boarding permission; China refused (Foreign Minister Maria Malmer Stenergard confirmed this on December 23, 2024). The vessel raised anchor and sailed to Port Said, Egypt, on November 21. C-Lion1 was offline from November 18–28 and restored on November 29. At time of writing, both outages remain marked “under investigation” with no attribution to any party; Western intelligence officials assess anchor damage as probable, but whether accidental or influenced by Russian intelligence remains speculative—not conclusive. Act III: On December 25, 2024, Estlink 2 power cable capacity fell from 1,016 MW to 358 MW. As documented in the [Wikipedia entry on the 2024 Estlink 2 incident](https://en.wikipedia.org/wiki/2024_Estlink_2_incident), the Cook Islands-flagged tanker Eagle S—managed by Peninsular Maritime India and widely assessed as part of Russia’s shadow fleet (though not listed among the EU’s 79 sanctioned vessels at the time)—crossed the cable’s location at 10:26 GMT and then reversed course. Finland suspected dragging anchor; that same night, four telecom cables were disturbed, including two fully severed Elisa cables. C-Lion1 went offline again from December 25, 2024, until January 6, 2025. Flags of convenience, shell companies, and refusal of boarding render formal attribution procedurally impossible.

A necessary counterpoint: CRS cites a 2017 assessment by the U.S. Office of the Director of National Intelligence stating that most interruptions stem from human activities—including fishing, anchoring, dredging—and natural disasters, with deliberate sabotage being rare. TeleGeography’s FAQ similarly describes intentional sabotage as “extremely rare.” The 2024 surge in suspicion does not contradict this historical baseline: the former reflects unconfirmed allegations; the latter reflects long-term statistics. Writing “no attribution found” as “no sabotage occurred,” or elevating “suspicion” to “confirmed attribution,” constitutes the same error.

## Who Governs the High-Seas Segments?

UNEP-WCMC’s report breaks down cable length by jurisdiction: 74% (1,316,790 km) lies within national territorial seas and exclusive economic zones (EEZs); 26% (464,333 km) falls beyond national jurisdiction. Territorial segments have clear owners: ICPC’s [FAQ](https://iscpc.org/information/frequently-asked-questions/) explicitly states landing points require government authorization. No designated authority protects high-seas segments. ICPC, founded in 1958, describes itself in its “About” section as a non-governmental, non-profit industry community comprising 260 member organizations from 70 countries. Its “Viewpoints” column advocates governmental “restraint” in regulating emerging uses like fiber-optic sensing—a lobbying position, not a neutral conclusion. The U.S. acts unilaterally: CRS enumerates foreign investment review (Team Telecom), bans on “untrusted” equipment, mandatory reporting of cable cuts, and expansion of repair fleets—directly citing the report’s central tension: privately owned infrastructure, maintained by its owners. The Wikipedia submarine cable entry notes the absence of binding international cybersecurity standards, potentially creating gaps in responding to cyber-enabled sabotage; it further observes that U.S.–China tensions have complicated repair arrangements for South China Sea segments as of 2025. Cables can double as seismic and oceanographic sensors (UNEP-WCMC). The same jointly authored report that cites the <0.01% environmental footprint also acknowledges biodiversity concerns.

## Three Judgments

Judgment One: The 99% figure cannot be precisely calculated; the very mechanism of its circulation is itself a governance problem [this article’s judgment]. Existing evidence: TeleGeography admits it cannot be calculated; FCC’s supporting data is outdated and U.S.-only. This article’s contribution: Budget allocations, policy debates, and public understanding all rest on a number increasingly cited yet never verified. Strongest rebuttal: The order-of-magnitude is robust; satellite share is demonstrably tiny; multiple institutions converge directionally—so while 99% is imprecise, it does not undermine the fundamental reality of cable dominance. Evidence that would overturn it: A verifiable measurement methodology emerges showing satellites or terrestrial routes carry a significant share of intercontinental traffic.

Judgment Two: The true single point of failure is not the cable—but repair capacity and permitting [this article’s synthesis + judgment]. Existing evidence: ~200 annual faults mostly go unnoticed; vessel fleets are booked years ahead; Balticconnector took ~six months to repair; ICPC restricts its repair-time comparison report behind a membership wall while lobbying for faster permitting. This article’s contribution: Governance framing should shift from “Who owns the cable?” to “Who bears responsibility for repair speed?” Ownership is clear (private assets), but no entity is accountable for how fast repairs happen. Strongest rebuttal: Markets are responding (U.S. fleet expansion, new vessel orders, maintenance contracts); six months may reflect permitting politics—not vessel shortages. Evidence that would overturn it: Significantly reduced repair times under identical permitting conditions would prove the bottleneck is vessels—not bureaucracy; or a major break where redundancy truly fails and private cable owners prioritize internal traffic over public interest.

Judgment Three: Tech giants’ privatization has altered the political economy of protection [this article’s judgment—subject to verification]. Existing evidence: CRS notes cloud demand drives new builds; Meta publicly announced 2Africa. This article’s contribution is a testable prediction: Under consortium mutual protection, “your cable failure affects my traffic”; under private ownership, repair priority follows internal business needs. Future major breaks will trigger more frequent landing-state permitting negotiations, making explicit the growing misalignment between public protection incentives and private ownership. Strongest rebuttal: Private cable owners still purchase maintenance agreements and participate in ICPC mutual aid; mutual protection hasn’t vanished—and 2Africa itself promotes an open-ecosystem ethos. Evidence that would overturn it: No statistically significant difference in repair-resource allocation between private and consortium cables during major events.

## What You Can Take Away

For infrastructure and policy professionals: Shift scrutiny from ownership to repair speed and permitting pathways; when citing “99%”, explicitly state it is unverifiable—do not let it masquerade as measured fact. For general readers: When encountering claims like “satellite constellations will replace submarine cables”, first ask about capacity, latency, and cost—TeleGeography notes satellite data is missing, not that satellites are functionally substitutable; the Baltic Sea lesson is that attribution is harder than repair—and plausible deniability is engineered.

If the submarine cable in international waters off your coast breaks, and repair vessels face a six-month waitlist—who should be held responsible for expediting the fix: the cable owner, the coastal state, or some international body? Join the discussion in the comments.

## Definitions and Boundaries

This article is based on publicly available materials, accessed on November 20, 2026. The figures '99%', '95%', and the FCC's '0.37%' represent three distinct methodological approaches and are not consolidated. The MAREA cable’s capacity is cited as 160/200 Tbps (CRS) and its potential capacity as 224 Tbps (TG FAQ); these two values are not conflated. TeleGeography is an industry data provider; its myth-busting article constitutes self-correction, while its FAQ page serves promotional purposes. The UNEP-WCMC report was jointly produced with the ICPC and underwent peer review involving industry professionals; however, numbers cited from it have not been independently verified. CRS (Congressional Research Service) reports reflect a U.S. congressional perspective; system counts and landing station data used herein correspond to the April 2022 timeframe. Meta’s statements are vendor self-promotion; for the 2Africa project, only the 2020 announcement figures are used. The ICPC is an industry association; its advocacy stance is explicitly noted—the 'About' section lists 70 countries, while the 'Mission' section lists 75; the 'About' figure is adopted here. For the Baltic Sea, Wikipedia’s integrated entry serves as a navigational hub, with cross-verification across multiple entries; conclusions are limited to the status marked as 'under investigation' at the time of access and are not extrapolated. The quotation attributed to Pistorius is relayed via The Guardian. McNamara’s title is retained verbatim as 'global security expert'. There is no publicly available figure for the global fleet of cable repair ships; only qualitative descriptions and individually verifiable cases are used. Historical content draws upon Wikipedia entries (tertiary sources), with key figures cross-checked against citations within those entries. The 'garden hose' analogy refers to relative thickness; the precise diameter—17 to 21 millimeters—is specified in the main text.

## Sources

Mythbusting Part 3: Do Submarine Cables Carry 99% of Intercontinental Data Traffic?, Alan Mauldin, TeleGeography, May 4, 2023, https://resources.telegeography.com/2023-mythbusting-part-3
Submarine Cable FAQs, TeleGeography, current page (accessed November 20, 2026), https://www2.telegeography.com/submarine-cable-faqs-frequently-asked-questions
Submarine cables and marine biodiversity, UNEP-WCMC, 2025, https://iscpc.org/documents/?id=4266
Undersea Cables: Background and Issues for Congress (R47237), CRS, September 13, 2022, mirror https://www.everycrsreport.com/reports/R47237.html
Submarine communications cable, Wikipedia, https://en.wikipedia.org/wiki/Submarine_communications_cable
Transatlantic telegraph cable, Wikipedia, https://en.wikipedia.org/wiki/Transatlantic_telegraph_cable
Operation Ivy Bells, Wikipedia, https://en.wikipedia.org/wiki/Operation_Ivy_Bells
Balticconnector, Wikipedia, https://en.wikipedia.org/wiki/Balticconnector
C-Lion1, Wikipedia, https://en.wikipedia.org/wiki/C-Lion1
Estlink, Wikipedia, https://en.wikipedia.org/wiki/Estlink
2024 Baltic Sea submarine cable disruptions, Wikipedia, https://en.wikipedia.org/wiki/2024_Baltic_Sea_submarine_cable_disruptions
2024 Estlink 2 incident, Wikipedia, https://en.wikipedia.org/wiki/2024_Estlink_2_incident
Building a transformative subsea cable to better connect Africa, Meta Engineering, May 13, 2020, https://engineering.fb.com/2020/05/13/connectivity/2africa/
ICPC official website and FAQ, https://iscpc.org; https://iscpc.org/information/frequently-asked-questions/
ICPC Global Comparison of Repair Commencement Times (data requires member login; this article cites only the publicly stated purpose of the page and the Viewpoints summary), https://iscpc.org/publications/icpc-global-comparison-of-repair-commencement-times/

Discussion